Skip to product information
1 of 7

Vesgantti 68" Loveseat Sofa with Movable Ottoman, Comfy Corduroy Couch with Spring Cushion, Sofa Couch with Solid Wood, Modern Office Sofa with Deep Seat for Living Room and Bedroom, Beige

Vesgantti 68" Loveseat Sofa with Movable Ottoman, Comfy Corduroy Couch with Spring Cushion, Sofa Couch with Solid Wood, Modern Office Sofa with Deep Seat for Living Room and Bedroom, Beige

Quantity
Regular price $474.30
Regular price Sale price $474.30
Sale Sold out
Shipping calculated at checkout.

About This

  • Sofa with Movable Ottoman - This sofa couch with a movable ottoman offers versatile configurations—turn it into an L-shaped sectional for division or use the ottoman alone as a footrest or extra seat. Flexible for living rooms, apartments, or bedrooms, its practical design and sleek look easily enhance any space, letting you create personalized setups
  • FSC Certified Solid Wood - Made with materials from well-managed forests that support sustainable forestry practices. This loveseat sofa is known for its sturdiness and solidity, with a maximum weight capacity of 772 lbs. Additionally, the sofa couch features non-slip protective backing on the bottom of the legs, providing stability and preventing damage to flooring
  • Ergonomic & Comfortable - The spring cushions of this corduroy couch absorb the impact of daily use, preventing rapid wear and tear and extending the life of the sofa couch. Its 21.3-inch seat depth shines, providing ample support for both upright and reclining seating, while the matching 26.3-inch ottoman enhances relaxation by providing leg support or additional seating, which together ensure excellent lumbar support and pressure relief, making every moment of relaxation feel relaxed and luxurious
  • Durable Corduroy Fabric - This corduroy sofa couch has a unique pattern and texture, characterised by parallel ridges that give it a smooth and soft feel. The modern couch has a clear and rounded velvet-like surface, which adds to its luxurious appearance. Additionally, sectional couch is thick and wear-resistant, making it an excellent choice for those who demand comfort and durability
  • Shipped in 2 Separate Packages - kindly allow for their arrival at different times. Slight color/size variations may occur due to displays/manual measurements. Easy 30-min assembly without additional tools. Cushions take 24-48 hours to fully recover due to compressed packaging. You can pat the cushion to make it fluffy and feel better. Contact us with questions

Overview

  • Brand : Vesgantti
  • Assembly Required : Yes
  • Seat Depth : 21.3 inches
  • Seat Height : 5.5 Inches
  • Weight Limit : 772 Pounds
  • Seating Capacity : 3.0
  • Product Dimensions : 56.3"D x 68"W x 35"H
  • Item Weight : 105.6 Pounds
  • Leg Length : 5.9 Inches
  • Type : Loveseat
  • 24/7 Customer Support
  • Risk-Free 30-Day Returns
  • Fast & Reliable U.S. Shipping

30-Day Hassle-Free Returns

Not satisfied? Return your order within 30 days for a full refund or exchange — simple and easy.

✔ Easy return process

✔ Fast refunds

✔ No hidden conditions

Fast U.S. Shipping

We ship within the United States only — no international delays.

✔ Processing time: 1–2 business days

✔ Delivery time: 3–7 business days

✔ Real-time tracking available

👉 Track your order anytime from the header via Track Order

View full details

DESIGNED FOR BETTER LIVING

history_edu   ━━ Modern Furniture For Every Room In Your Home

At ModernFurniture Deals, we believe great furniture should combine style, comfort, quality, and affordability.

Our collections are carefully selected to help customers create beautiful living spaces that feel welcoming, functional, and timeless.

From modern living room furniture and bedroom essentials to home office furniture, dining room furniture, and outdoor furniture, we offer pieces designed to fit the way people live today.

Whether you're furnishing a new home, upgrading a room, or creating a more comfortable space for everyday living, we're committed to helping you find furniture you'll enjoy for years to come.

10+ YEARS OF FURNITURE EXPERIENCE
7000+ HAPPY CUSTOMERS
Best-Selling Furniture Categories
Sectional Sofas
Patio Furniture
 Office Furniture
Storage Furniture
BedroomFurniture
Small  Furniture

WHY SHOP WITH US

help_outline   ━━ Better Living Starts Here

At ModernFurniture Deals, we focus on bringing together style, comfort, quality, and value.

Our carefully selected furniture collections are designed to help create beautiful living spaces that fit modern lifestyles. From living room furniture and bedroom essentials to home office and outdoor furniture, we make it easier to find pieces you'll love for years to come.

10K+

HAPPY CUSTOMERS

50+

TOP COLLECTIONS

93%

Positive Customer Reviews

1000+

Verified Customer Reviews

Furniture For Better Living
Modern Furniture For Every Home
Style Your Home For Less
Comfort Meets Modern Design
Timeless Furniture. Everyday Comfort.
At ModernFurniture Deals, we focus on bringing together style, comfort, quality, and value.

TRANSFORM YOUR SPACE

compare   ━━ Before & After
Discover how the right furniture can completely transform the look, comfort, and functionality of your home. From living rooms and bedrooms to home offices and outdoor spaces, small changes can make a big difference.
Style & Appearance 95 %
Comfort & Functionality 90 %
Space Optimization 88 %
Storage & Organization 92 %

Furniture Buying Questions

How do I choose the right furniture size for my room?
remove
add
Measure your room before purchasing and leave enough space for walking and daily movement. Product dimensions are listed on each product page to help you find the perfect fit.
What furniture styles are most popular right now?
remove
add
Modern, organic modern, minimalist, and natural wood furniture remain the most popular choices. Neutral colors and functional designs continue to dominate home design trends.
How long does shipping take?
remove
add
Most orders are processed within 1–2 business days. Delivery typically takes 3–8 business days depending on your location and product availability.
Can I return furniture if it doesn't fit my space?
remove
add
Yes. Eligible products may be returned within 30 days of delivery. Please review our Return Policy for complete details and eligibility requirements.
Is assembly required for furniture?
remove
add
Some furniture requires simple assembly. Assembly information and instructions are provided on the product page whenever applicable.
What is the best furniture for small spaces?
remove
add
Space-saving furniture, storage beds, modular sofas, nesting tables, and multifunctional furniture are among the most popular solutions for apartments and smaller homes.
Smartphone with email subscription interface on a table with a cup of coffee and plant.

Unlock Exclusive Offers

Be the first to know about new collections and exclusive offers.

Subscribe Now