Skip to product information
1 of 7

Vesgantti Sectional Couches with Storage Seats, 118" L Shaped Convertible Modular Sectional Sofa, 4 Seat & 2 Ottomans Velvet Storage Chaises Deep Seat Couch for Living Room, Bedroom, Apartment, Gray

Vesgantti Sectional Couches with Storage Seats, 118" L Shaped Convertible Modular Sectional Sofa, 4 Seat & 2 Ottomans Velvet Storage Chaises Deep Seat Couch for Living Room, Bedroom, Apartment, Gray

Quantity
Regular price $1,239.98
Regular price Sale price $1,239.98
Sale Sold out
Shipping calculated at checkout.

About This

  • MODULAR SPACE-SAVING SECTIONAL SOFA – The Vesgantti modular sofa features a full modular design with a clean modern aesthetic, ideal for apartments, condos, studios, offices, basements, and family rooms. It can be freely reconfigured into a living room couch, sofa bed, U-shaped sectional, or corner sofa to fit different layouts and lifestyles. Overall dimensions: 118.3”W x 59.8”L x 26.8”H, making it a versatile centerpiece for small to medium living spaces
  • CUSTOMIZABLE COMFORT WITH ADJUSTABLE ERGONOMICS – Vesgantti sleeper sofa is engineered for personalized comfort, featuring a generous 27–54 inch adjustable seat depth with soft cushions and high-density memory foam for ergonomic support. Human-centered design allows the backrest and armrest to be adjusted to multiple angles, offering flexible lounging, sitting, and reclining positions. Designed for everyday comfort in small-space living without compromising support
  • HIDDEN STORAGE DESIGN FOR SPACE EFFICIENCY – Practicality is enhanced with built-in storage compartments under each seat and ottoman, helping maximize space in compact homes. Each compartment measures 23.4"L x 23.4"W x 6.7"H and includes a detachable partition with wide-opening access, making it easy to store and organize blankets, pillows, clothing, toys, and daily essentials while keeping your living space clutter-free
  • MODULAR EASY ASSEMBLY & FLEXIBLE CONFIGURATION – The deep seat modular sectional sofa features a modular design for simple assembly and flexible reconfiguration to fit your space needs. The sofa arrives in 5 packages (may arrive separately) with all necessary tools and clear instructions included for setup in about one hour. Two leg height options (2.76" & 4.72") allow you to create a low modern profile or extra clearance for convenient robot vacuum cleaning
  • DURABLE CONSTRUCTION & PREMIUM PET-FRIENDLY FABRIC – Built with a reinforced FSC-certified hardwood frame, this sectional storage couch ensures long-lasting stability, strength, and shape retention. Upholstered in premium velvet fabric, it is soft, skin-friendly, and designed to be scratch-resistant, durable, and pet-friendly while helping conceal everyday marks and wear. Backed by a dedicated customer service team for reliable post-purchase support

Overview

  • Brand : Vesgantti
  • Assembly Required : Yes
  • Seat Height : 18.9 Inches
  • Weight Limit : 1800 Pounds
  • Seating Capacity : 6
  • Product Dimensions : 54.3"D x 118.3"W x 26.8"H
  • Item Weight : 78 Pounds
  • Leg Length : 2.76 Inches
  • Type : Sleeper
  • Color : Grey
  • 24/7 Customer Support
  • Risk-Free 30-Day Returns
  • Fast & Reliable U.S. Shipping

30-Day Hassle-Free Returns

Not satisfied? Return your order within 30 days for a full refund or exchange — simple and easy.

✔ Easy return process

✔ Fast refunds

✔ No hidden conditions

Fast U.S. Shipping

We ship within the United States only — no international delays.

✔ Processing time: 1–2 business days

✔ Delivery time: 3–7 business days

✔ Real-time tracking available

👉 Track your order anytime from the header via Track Order

View full details

DESIGNED FOR BETTER LIVING

history_edu   ━━ Modern Furniture For Every Room In Your Home

At ModernFurniture Deals, we believe great furniture should combine style, comfort, quality, and affordability.

Our collections are carefully selected to help customers create beautiful living spaces that feel welcoming, functional, and timeless.

From modern living room furniture and bedroom essentials to home office furniture, dining room furniture, and outdoor furniture, we offer pieces designed to fit the way people live today.

Whether you're furnishing a new home, upgrading a room, or creating a more comfortable space for everyday living, we're committed to helping you find furniture you'll enjoy for years to come.

10+ YEARS OF FURNITURE EXPERIENCE
7000+ HAPPY CUSTOMERS
Best-Selling Furniture Categories
Sectional Sofas
Patio Furniture
 Office Furniture
Storage Furniture
BedroomFurniture
Small  Furniture

WHY SHOP WITH US

help_outline   ━━ Better Living Starts Here

At ModernFurniture Deals, we focus on bringing together style, comfort, quality, and value.

Our carefully selected furniture collections are designed to help create beautiful living spaces that fit modern lifestyles. From living room furniture and bedroom essentials to home office and outdoor furniture, we make it easier to find pieces you'll love for years to come.

10K+

HAPPY CUSTOMERS

50+

TOP COLLECTIONS

93%

Positive Customer Reviews

1000+

Verified Customer Reviews

Furniture For Better Living
Modern Furniture For Every Home
Style Your Home For Less
Comfort Meets Modern Design
Timeless Furniture. Everyday Comfort.
At ModernFurniture Deals, we focus on bringing together style, comfort, quality, and value.

TRANSFORM YOUR SPACE

compare   ━━ Before & After
Discover how the right furniture can completely transform the look, comfort, and functionality of your home. From living rooms and bedrooms to home offices and outdoor spaces, small changes can make a big difference.
Style & Appearance 95 %
Comfort & Functionality 90 %
Space Optimization 88 %
Storage & Organization 92 %

Furniture Buying Questions

How do I choose the right furniture size for my room?
remove
add
Measure your room before purchasing and leave enough space for walking and daily movement. Product dimensions are listed on each product page to help you find the perfect fit.
What furniture styles are most popular right now?
remove
add
Modern, organic modern, minimalist, and natural wood furniture remain the most popular choices. Neutral colors and functional designs continue to dominate home design trends.
How long does shipping take?
remove
add
Most orders are processed within 1–2 business days. Delivery typically takes 3–8 business days depending on your location and product availability.
Can I return furniture if it doesn't fit my space?
remove
add
Yes. Eligible products may be returned within 30 days of delivery. Please review our Return Policy for complete details and eligibility requirements.
Is assembly required for furniture?
remove
add
Some furniture requires simple assembly. Assembly information and instructions are provided on the product page whenever applicable.
What is the best furniture for small spaces?
remove
add
Space-saving furniture, storage beds, modular sofas, nesting tables, and multifunctional furniture are among the most popular solutions for apartments and smaller homes.
Smartphone with email subscription interface on a table with a cup of coffee and plant.

Unlock Exclusive Offers

Be the first to know about new collections and exclusive offers.

Subscribe Now