Skip to product information
1 of 8

Vesgantti 6 in 1 Convertible Folding Sleeper Sofa Bed, 110.2" Modular Sectional Sofa with Curved Armrest, Chenille Boneless Couch for Living Room, No Assembly Required, Beige, Left Facing Chaise

Vesgantti 6 in 1 Convertible Folding Sleeper Sofa Bed, 110.2" Modular Sectional Sofa with Curved Armrest, Chenille Boneless Couch for Living Room, No Assembly Required, Beige, Left Facing Chaise

Quantity
Regular price $1,084.98
Regular price Sale price $1,084.98
Sale Sold out
Shipping calculated at checkout.

About This

  • 6-in-1 Convertible Folding Sofa Bed: Featuring a simple folding mechanism, the convertible sofa easily transforms into at least 6 modes: loveseat, L shaped sofa, foldable couch, lounger, queen & king guest bed. It combines style, comfort, and space-saving functionality in one smart design. The adaptive design allows you to reconfigure the sofa into various shapes that meets the needs of different occasions, such as naps, movie nights, friends' gathering or overnight guests etc.
  • Ergonomic Comfort Design: This convertible couch with chaise features a fully foam-filled structure, 3 adjustable reclining angled backrest pillows, and curved armrests that follow your body's natural posture and deliver superior pressure relief and ergonomic support. Filled with resilient high-density foam that maintains shape and provides balanced support for sitting or sleeping. This sofa bed is an ideal choice for modern lifestyles.
  • Sturdy & Durable: No separate metal or wooden frame needed — the foam core acts as both cushion and structural support, eliminating weak joints, loose screws, or wobbling legs. Non-slip bottom keep the couch bed securely in place on hardwood or tile floors, while preventing scratches and reducing noise during adjustment. This frameless, integrated design makes the sofa bed couch lightweight yet incredibly stable and is perfect for years of daily folding and unfolding
  • Premium Chenille Fabric: The foldable couch is crafted from soft, skin-friendly chenille fabric, which is scratch-resistant, wrinkle-resistant and pill-resistant; ensuring long-term durability and making it perfect for daily use. The tightly woven surface is pet-friendly — fur, dirt, and scratches are easily cleaned with a lint roller or damp cloth, keeping your sofa looking fresh (Note: Colors may vary slightly due to lighting or monitor settings)
  • No Assembly Required: No tools or complicated setup are required. Our boneless couch bed is compressed and vacuum-packed; just simply unfold, adjust to your preferred configuration, and wait 72 hours for full recovery. The foldable sofa bed is packaged in 2 boxes, which may arrive on different days. Before assembling, please check all packages. If you have any questions or are dissatisfied with our sofa, please feel free to contact us

Overview

  • Brand : Vesgantti
  • Assembly Required : No
  • Seat Depth : 27.6 inches
  • Seat Height : 17.71 Inches
  • Seating Capacity : 4.0
  • Product Dimensions : 37.4"D x 110.2"W x 24.4"H
  • Item Weight : 82 Pounds
  • Type : Sofa Bed
  • Color : Beige
  • Style : Modern
  • 24/7 Customer Support
  • Risk-Free 30-Day Returns
  • Fast & Reliable U.S. Shipping

30-Day Hassle-Free Returns

Not satisfied? Return your order within 30 days for a full refund or exchange — simple and easy.

✔ Easy return process

✔ Fast refunds

✔ No hidden conditions

Fast U.S. Shipping

We ship within the United States only — no international delays.

✔ Processing time: 1–2 business days

✔ Delivery time: 3–7 business days

✔ Real-time tracking available

👉 Track your order anytime from the header via Track Order

View full details

DESIGNED FOR BETTER LIVING

history_edu   ━━ Modern Furniture For Every Room In Your Home

At ModernFurniture Deals, we believe great furniture should combine style, comfort, quality, and affordability.

Our collections are carefully selected to help customers create beautiful living spaces that feel welcoming, functional, and timeless.

From modern living room furniture and bedroom essentials to home office furniture, dining room furniture, and outdoor furniture, we offer pieces designed to fit the way people live today.

Whether you're furnishing a new home, upgrading a room, or creating a more comfortable space for everyday living, we're committed to helping you find furniture you'll enjoy for years to come.

10+ YEARS OF FURNITURE EXPERIENCE
7000+ HAPPY CUSTOMERS
Best-Selling Furniture Categories
Sectional Sofas
Patio Furniture
 Office Furniture
Storage Furniture
BedroomFurniture
Small  Furniture

WHY SHOP WITH US

help_outline   ━━ Better Living Starts Here

At ModernFurniture Deals, we focus on bringing together style, comfort, quality, and value.

Our carefully selected furniture collections are designed to help create beautiful living spaces that fit modern lifestyles. From living room furniture and bedroom essentials to home office and outdoor furniture, we make it easier to find pieces you'll love for years to come.

10K+

HAPPY CUSTOMERS

50+

TOP COLLECTIONS

93%

Positive Customer Reviews

1000+

Verified Customer Reviews

Furniture For Better Living
Modern Furniture For Every Home
Style Your Home For Less
Comfort Meets Modern Design
Timeless Furniture. Everyday Comfort.
At ModernFurniture Deals, we focus on bringing together style, comfort, quality, and value.

TRANSFORM YOUR SPACE

compare   ━━ Before & After
Discover how the right furniture can completely transform the look, comfort, and functionality of your home. From living rooms and bedrooms to home offices and outdoor spaces, small changes can make a big difference.
Style & Appearance 95 %
Comfort & Functionality 90 %
Space Optimization 88 %
Storage & Organization 92 %

Furniture Buying Questions

How do I choose the right furniture size for my room?
remove
add
Measure your room before purchasing and leave enough space for walking and daily movement. Product dimensions are listed on each product page to help you find the perfect fit.
What furniture styles are most popular right now?
remove
add
Modern, organic modern, minimalist, and natural wood furniture remain the most popular choices. Neutral colors and functional designs continue to dominate home design trends.
How long does shipping take?
remove
add
Most orders are processed within 1–2 business days. Delivery typically takes 3–8 business days depending on your location and product availability.
Can I return furniture if it doesn't fit my space?
remove
add
Yes. Eligible products may be returned within 30 days of delivery. Please review our Return Policy for complete details and eligibility requirements.
Is assembly required for furniture?
remove
add
Some furniture requires simple assembly. Assembly information and instructions are provided on the product page whenever applicable.
What is the best furniture for small spaces?
remove
add
Space-saving furniture, storage beds, modular sofas, nesting tables, and multifunctional furniture are among the most popular solutions for apartments and smaller homes.
Smartphone with email subscription interface on a table with a cup of coffee and plant.

Unlock Exclusive Offers

Be the first to know about new collections and exclusive offers.

Subscribe Now