Vesgantti Sectional Couches with Storage Seats, 118" L Shaped Convertible Modular Sectional Sofa, 4 Seat & 1 Ottoman Velvet Storage Chaises Deep Seat Couch for Living Room, Bedroom, Apartment, Blue
Vesgantti Sectional Couches with Storage Seats, 118" L Shaped Convertible Modular Sectional Sofa, 4 Seat & 1 Ottoman Velvet Storage Chaises Deep Seat Couch for Living Room, Bedroom, Apartment, Blue
Couldn't load pickup availability
About This
- MODULAR SPACE-SAVING SECTIONAL SOFA – The Vesgantti modular sofa features a full modular design with a clean modern aesthetic, ideal for apartments, condos, studios, offices, basements, and family rooms. It can be freely reconfigured into a living room couch, sofa bed, U-shaped sectional, or corner sofa to fit different layouts and lifestyles. Overall dimensions: 118.3”W x 59.8”L x 26.8”H, making it a versatile centerpiece for small to medium living spaces
- CUSTOMIZABLE COMFORT WITH ADJUSTABLE ERGONOMICS – Vesgantti sleeper sofa is engineered for personalized comfort, featuring a generous 27–54 inch adjustable seat depth with soft cushions and high-density memory foam for ergonomic support. Human-centered design allows the backrest and armrest to be adjusted to multiple angles, offering flexible lounging, sitting, and reclining positions. Designed for everyday comfort in small-space living without compromising support
- HIDDEN STORAGE DESIGN FOR SPACE EFFICIENCY – Practicality is enhanced with built-in storage compartments under each seat and ottoman, helping maximize space in compact homes. Each compartment measures 23.4"L x 23.4"W x 6.7"H and includes a detachable partition with wide-opening access, making it easy to store and organize blankets, pillows, clothing, toys, and daily essentials while keeping your living space clutter-free
- MODULAR EASY ASSEMBLY & FLEXIBLE CONFIGURATION – The deep seat modular sectional sofa features a modular design for simple assembly and flexible reconfiguration to fit your space needs. The sofa arrives in 4 packages (may arrive separately) with all necessary tools and clear instructions included for setup in about one hour. Two leg height options (2.76" & 4.72") allow you to create a low modern profile or extra clearance for convenient robot vacuum cleaning
- DURABLE CONSTRUCTION & PREMIUM PET-FRIENDLY FABRIC – Built with a reinforced FSC-certified hardwood frame, this sectional storage couch ensures long-lasting stability, strength, and shape retention. Upholstered in premium velvet fabric, it is soft, skin-friendly, and designed to be scratch-resistant, durable, and pet-friendly while helping conceal everyday marks and wear. Backed by a dedicated customer service team for reliable post-purchase support
Overview
- Brand : Vesgantti
- Assembly Required : Yes
- Seat Depth : 27.1 inches
- Weight Limit : 1500 Pounds
- Seating Capacity : 5.0
- Product Dimensions : 27.1"D x 26.8"W x 91.7"H
- Item Weight : 78 Pounds
- Leg Length : 2.76 Inches
- Type : Sectional
- Color : Blue
- 24/7 Customer Support
- Risk-Free 30-Day Returns
- Fast & Reliable U.S. Shipping
Contact Information
Contact Information
30-Day Hassle-Free Returns
30-Day Hassle-Free Returns
Not satisfied? Return your order within 30 days for a full refund or exchange — simple and easy.
✔ Easy return process
✔ Fast refunds
✔ No hidden conditions
Fast U.S. Shipping
Fast U.S. Shipping
We ship within the United States only — no international delays.
✔ Processing time: 1–2 business days
✔ Delivery time: 3–7 business days
✔ Real-time tracking available
👉 Track your order anytime from the header via Track Order

DESIGNED FOR BETTER LIVING
At ModernFurniture Deals, we believe great furniture should combine style, comfort, quality, and affordability.
Our collections are carefully selected to help customers create beautiful living spaces that feel welcoming, functional, and timeless.
From modern living room furniture and bedroom essentials to home office furniture, dining room furniture, and outdoor furniture, we offer pieces designed to fit the way people live today.
Whether you're furnishing a new home, upgrading a room, or creating a more comfortable space for everyday living, we're committed to helping you find furniture you'll enjoy for years to come.
WHY SHOP WITH US
At ModernFurniture Deals, we focus on bringing together style, comfort, quality, and value.
Our carefully selected furniture collections are designed to help create beautiful living spaces that fit modern lifestyles. From living room furniture and bedroom essentials to home office and outdoor furniture, we make it easier to find pieces you'll love for years to come.
10K+
HAPPY CUSTOMERS
50+
TOP COLLECTIONS
93%
Positive Customer Reviews
1000+
Verified Customer Reviews
TRANSFORM YOUR SPACE
Furniture Buying Questions
Style Guide